9.2.3. Removal and CV JOINT installation and protective covers of power shafts
37a — the Power shaft 37b — the External hinge 37s — the Internal hinge 37d — a hinge Nave 37e — the Ball 37f — the Separator
37g — the Lock ring 37h — the Cover 37i — the Epiploon 37k — the Collar 37I, 37m — Protective covers
Removal
PERFORMANCE ORDER
1. Remove a power shaft. 2. Remove collars 37k. 3. Uncover 37h and an epiploon 37i on a hinged ring of 37 pages. 4. Remove a lock ring 37g. 5. Remove a protective cover 37l with an epiploon 37i. 6. Remove the internal hinge 37c - 37f from a power shaft. 7. Remove a protective cover 37m.
Installation
PERFORMANCE ORDER
Installation is carried out as it should be, the return to removal.
Amount of lubricant: the internal hinge - 120-150 g; the external hinge - 120 g.